Production process
Basic information
Cost of electric power for 1 m2 | 0,48 kWt |
Materials | portland cement M400,sand, additives, pigments, water |
Productivity of SISTROM per shift | 100 m2 |
Characteristics of the production
Productivity of the line
Facing tile | from 40 to 500 m2 of tiles per shift |
Sidewalk tile | from 40 to 500 m2 of tiles per shift |
Texturized brick | 2000 units per shift |
Production area | from 100 m2 |
Technological process
![]() 1. Preparation of moulding mixture |
![]() 2. Preparation of a cassette |
![]() 3. Holding for 24 hours |
![]() 4. After 24 hours |
![]() 5. Removal of products |
![]() 6. Packing
|
![]() 7. Transportation
|
![]() 8. Laying
|